This new 22,000 SF warehouse is located in LaGrange, Georgia. The design-build team consisted of Principle Construction, Smith Design Group and Stothard Engineering. The pre-engineered metal building was manufactured by Vulcan. The addition included a raised foundation with slab, a new overheard crane, and loading docks.