BUILT ON

PRINCIPLE

OUR PROJECTS

Purpose-Driven Projects. %%Principle-Led Results.%%

From private builds to public spaces, our construction projects show the range of environments we help bring to life. Explore the categories to see how different goals and needs shape the work we deliver.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Hillside Montessori School

Principle was hired as Construction Manager for this new 16,000 SF private school. Services included planning, value engineering, cost estimating, scoping and bidding to local subcontractors, managing all construction activities, and owner move-in. 

Principle was hired as Construction Manager for this new 16,000 SF private school.  Services included planning, value engineering, cost estimating, scoping and bidding to local subcontractors, managing all construction activities, and owner move-in. 

Learn more

Granger Park Renovation

The $1.6 million Granger Park Playground project consists of complete renovations to an existing 1.5-acre playground in LaGrange, Georgia. This SPLOST funded project features new playground equipment and furnishings, 36 ft. pavilion with picnic tables, oval tricycle path, entrance trellis, unique boardwalk structure, new parking lot with handicap access, new landscaping with added flowers and trees, and a walking trail with direct connection to the thread.

The $1.6 million Granger Park Playground project consists of complete renovations to an existing 1.5-acre playground in LaGrange, Georgia. This SPLOST funded project features new playground equipment and furnishings, 36 ft. pavilion with picnic tables, oval tricycle path, entrance trellis, unique boardwalk structure, new parking lot with handicap access, new landscaping with added flowers and trees, and a walking trail with direct connection to the thread.

Learn more

LaGrange Memorial Library

The Troup County Library Board of Trustees hired Principle to renovate the 12,000 square feet existing facility and add an additional 7,000 square feet. The renovations include meeting rooms, children’s areas, reading nooks, outdoor play area, and offices. The project was completed in February 2023.

The Troup County Library Board of Trustees hired Principle to renovate the 12,000 square feet existing facility and add an additional 7,000 square feet. The renovations include meeting rooms, children’s areas, reading nooks, outdoor play area, and offices. The project was completed in February 2023.

Learn more

The Estate at Elegant Occasions Event Center

Principle was hired to build out The Estate at Elegant Occasions Event Center in Hogansville, Georgia. The project consisted of a new groom’s suite, office areas and additional storage for event tables and accessories. In the main event center room ornamental metal was added to the ceiling, new doors and fixtures including two chandeliers, windows, and new painting and staining were completed. The 3,700 SF Event Center can host events accommodating up to 120 people.

Principle was hired to build out The Estate at Elegant Occasions Event Center in Hogansville, Georgia. The project consisted of a new groom’s suite, office areas and additional storage for event tables and accessories. In the main event center room ornamental metal was added to the ceiling, new doors and fixtures including two chandeliers, windows, and new painting and staining were completed. The 3,700 SF Event Center can host events accommodating up to 120 people.

Learn more

Recycling & Distribution Center

The project consisted of a two story office building providing offices, meeting spaces, educational areas and a roof-top garden. The rear of the facility is where the recyclables are received, sorted and staged in a 45,000 SF warehouse. The warehouse includes equipment pits, bunker walls, loading docks, and automated overhead doors.

The project consisted of a two story office building providing offices, meeting spaces, educational areas and a roof-top garden. The rear of the facility is where the recyclables are received, sorted and staged in a 45,000 SF warehouse. The warehouse includes equipment pits, bunker walls, loading docks, and automated overhead doors. Jay Johnson served as Sr. Project Manager, and the project obtained LEED Certification, the first of any significant capital improvement projects for the Consolidated Government of Columbus and Muscogee County. The Columbus Recycling and Sustainability Center processes all recyclables for Muscogee County and the surrounding areas daily.

Learn more

Camp Viola Event Hall

Principle was hired to help plan, design and build the new event hall at Camp Viola. The existing dining hall had become structurally unsound so it was demolished while designs for a new event hall were planned. The new facility includes a multi-purpose large room that can be used for dining during camp, weddings and events, a commercial kitchen, restrooms, bathrooms, three bedrooms and a large porch on two sides. A new basketball court and landscaping were added.

Principle was hired to help plan, design and build the new event hall at Camp Viola. The existing dining hall had become structurally unsound so it was demolished while designs for a new event hall were planned. The new facility includes a multi-purpose large room that can be used for dining during camp, weddings and events, a commercial kitchen, restrooms, bathrooms, three bedrooms and a large porch on two sides. A new basketball court and landscaping were added.

Learn more

Historic Davis Building Renovation

This historic building was constructed in 1875 on the square in downtown LaGrange, Georgia. It is the oldest remaining building on the square. In 1898 a room was added to the front and a Mesker Brothers decorative metal storefront was added to the building which is still in tact today and gives the building its ornate look.

This historic building was constructed in 1875 on the square in downtown LaGrange, Georgia. It is the oldest remaining building on the square. In 1898 a room was added to the front and a Mesker Brothers decorative metal storefront was added to the building which is still in tact today and gives the building its ornate look. Principle Construction restored and renovated the building in an effort to prevent demolition and preserve the historic character of downtown LaGrange. The Davis building features a basement and two floors above ground. A steel frame was added inside the load bearing walls. An EIFS system was applied to the exterior. The project owner is United Investors, project architect was Smith Design Group, and the project engineer was Stothard Engineering.

The first floor now houses a boutique and the second floor houses Lafayette Loft.

Learn more

Historic Sweet Auburn Avenue Retail Renovation

This project was a Historic Renovation of a building that was originally built in 1920 on the acclaimed Sweet Auburn Avenue in Atlanta. Principle gutted the building and a new stainless steel storefront was added. Floors have been stripped to expose the terrazzo tile floors. The use of the building is retail on the first floor and residential on the second floor. Tenants include the Atlanta Breakfast Club and Sweet Auburn Community Museum.

This project was a Historic Renovation of a building that was originally built in 1920 on the acclaimed Sweet Auburn Avenue in Atlanta. Principle gutted the building and a new stainless steel storefront was added. Floors have been stripped to expose the terrazzo tile floors. The use of the building is retail on the first floor and residential on the second floor. Tenants include the Atlanta Breakfast Club and Sweet Auburn Community Museum.

Learn more

Ridley Lake

Ridley Lake Park is a 44-acre development for the City of LaGrange that will bring new recreational space to the community. The site will feature walking trails, open areas, and a playground overlooking the lake. Our team is currently managing construction, coordinating design details, and preparing the grounds for public use.

Ridley Lake Park is a 44-acre development for the City of LaGrange that will bring new recreational space to the community. The site will feature walking trails, open areas, and a playground overlooking the lake. Our team is currently managing construction, coordinating design details, and preparing the grounds for public use.

Learn more

Remington Warehouse & Office Space

The Remington facility in LaGrange, GA, features 280,000 square feet of manufacturing and warehouse space and 20,000 square feet of offices. Completed for long-term durability and efficiency, the project supports the client’s growing industrial presence in the region.

The Remington facility in LaGrange, GA, features 280,000 square feet of manufacturing and warehouse space and 20,000 square feet of offices. Completed for long-term durability and efficiency, the project supports the client’s growing industrial presence in the region.

Learn more

YOGAO

The YOGAO project in LaGrange, GA, features 50,000 square feet of warehouse space with integrated office and restroom areas. Designed as a speculative facility, it provides adaptable space for future manufacturing or distribution operations.

The YOGAO project in LaGrange, GA, features 50,000 square feet of warehouse space with integrated office and restroom areas. Designed as a speculative facility, it provides adaptable space for future manufacturing or distribution operations.

Learn more

Callaway Blue Spring Water Expansion

New Construction and Renovations are complete for the 65,000 SF and 8,000 SF Office Space. The warehouse consisted of a PEMB with foundation walls comprising a new truck court and trucker’s lounge. The new PEMB is free-span with no interior colum lines, has a standing seam roof and liner panels that extend from floor to ceiling. Fire Wall Assemblies were included to separate process areas and office from the new warehouse. This facility also features the latest / greatest dock equipment safety features available and automated ventilation systems.

New Construction and Renovations are complete for the 65,000 SF and 8,000 SF Office Space. The warehouse consisted of a PEMB with foundation walls comprising a new truck court and trucker’s lounge. The new PEMB is free-span with no interior colum lines, has a standing seam roof and liner panels that extend from floor to ceiling. Fire Wall Assemblies were included to separate process areas and office from the new warehouse. This facility also features the latest / greatest dock equipment safety features available and automated ventilation systems.

Learn more

Kimberly Clark Additions & Renovations

Principle was hired for multiple additions and renovations at the LaGrange Plant. The first project involved building a 30′ x 600′ wall to separate a warehouse into two areas. One area was conditioned to create a production area. Two mobile office units were added with sidewalks for covid testing on the front of the plant.

Principle was hired for multiple additions and renovations at the LaGrange Plant. The first project involved building a 30′ x 600′ wall to separate a warehouse into two areas. One area was conditioned to create a production area. Two mobile office units were added with sidewalks for covid testing on the front of the plant. A three story addition was then added on the back of the plant. It houses blowers and bailers for production equipment along with advanced sensitive control equipment and a highly regulated heating and air conditioned space. Principle replaced two 30 ton split units in the existing plant as well as reroofing one of the buildings.

Learn more

Nesper International Plant Expansion

Principle Construction was hired to add 11,000 sq. ft. of manufacturing space at Nesper International. The project has no interior columns and a clear span of 75 feet. Three cranes are hung and supported by the roof. The concrete slab is topped with a Sikka product to add an orange peel 10,000 lbs/sf protective coating.

Principle Construction was hired to add 11,000 sq. ft. of manufacturing space at Nesper International. The project has no interior columns and a clear span of 75 feet. Three cranes are hung and supported by the roof. The concrete slab is topped with a Sikka product to add an orange peel 10,000 lbs/sf protective coating. The addition is located on the back of the existing plant. The Design-Build team consisted of Smith Design Group for architectural design, and Starzer Brady Fagan for structural design. Nesper is a German based firm and this is their only U.S. operation. They manufacture contact rivets, stamped parts and plastic assemblies for the electrical and electronic industries.

Learn more

Fokker Services

For Fokker Services, a Dutch aerospace company refurbishing aircraft components, we completed extensive upgrades at their LaGrange, GA, facility. The work included a new solar farm, 10,000 square feet of warehouse space, a new test cell, and renovations to 20,000 square feet of office space. This project enhanced capacity and modernized the site with minimal disruption, all while the client remained in operation.

For Fokker Services, a Dutch aerospace company refurbishing aircraft components, we completed extensive upgrades at their LaGrange, GA, facility. The work included a new solar farm, 10,000 square feet of warehouse space, a new test cell, and renovations to 20,000 square feet of office space. This project enhanced capacity and modernized the site with minimal disruption, all while the client remained in operation.

Learn more

Ray C. Anderson Plant Break Room

Principle was hired by Interface Flooring to build an interior break room and outside gathering and eating pavilion and seating spaces. The interior break room included refrigerators, microwaves, vending machines, seating areas, and lobby renovations.

Principle was hired by Interface Flooring to build an interior break room and outside gathering and eating pavilion and seating spaces. The interior break room included refrigerators, microwaves, vending machines, seating areas, and lobby renovations.

Learn more

Interface Kyle 3 Plant

This project involved adding 17′ to the roof to allow for taller equipment to fit. Principle worked with Interface Engineering to determine the footing design and column spacing for the new structural columns. The project was completed within the short schedule to allow for the equipment to be installed.

This project involved adding 17′ to the roof to allow for taller equipment to fit. Principle worked with Interface Engineering to determine the footing design and column spacing for the new structural columns. The project was completed within the short schedule to allow for the equipment to be installed.

In phase 2 of the Interface Kyle 3 project, Principle Construction installed the civil infrastructure to support the equipment modification completed earlier in phase 1. The project included the addition of 460 ft. of access drive with DOT guardrails, 5 ft. depth Silo base pad with auger-cast pile foundation, 18 ft. x 56 ft. pre-engineered metal building, new fencing and landscaping.

Learn more

Mercer Medical Clinic

This 5,200 SF primary care facility located in Hamilton, Georgia is a collaboration between Mercer University and Harris County government. Southern A&E was the architect. The project consisted of renovations of an existing library updated to a state-of-the-area facility including 8 exam rooms, X-ray imaging room, consultation rooms, patient waiting rooms, Doctors offices, and receptionist desk.

This 5,200 SF primary care facility located in Hamilton, Georgia is a collaboration between Mercer University and Harris County government. Southern A&E was the architect. The project consisted of renovations of an existing library updated to a state-of-the-area facility including 8 exam rooms, X-ray imaging room, consultation rooms, patient waiting rooms, Doctors offices, and receptionist desk.

Learn more

Medical Park Foundation Building 100

Principle renovated Building 100 in the Medical Park adjacent to WellStar Medical Center in LaGrange, Georgia to accommodate two new doctors. Complete renovations were made to the upper floor and lower floor of the building. Two new lobbies, three doctors offices, multiple exam rooms and a lab were added.

Principle renovated Building 100 in the Medical Park adjacent to WellStar Medical Center in LaGrange, Georgia to accommodate two new doctors. Complete renovations were made to the upper floor and lower floor of the building. Two new lobbies, three doctors offices, multiple exam rooms and a lab were added.

Learn more

Medical Park Foundation Building 700

Principle renovated Building 700 in the Medical Park adjacent to WellStar Medical Center in LaGrange, Georgia to accommodate two new doctors. Renovations were made to the upper floor and lower floor of the building. Two new lobbies, three doctors offices, multiple exam rooms and a lab were added.

Principle renovated Building 700 in the Medical Park adjacent to WellStar Medical Center in LaGrange, Georgia to accommodate two new doctors. Renovations were made to the upper floor and lower floor of the building. Two new lobbies, three doctors offices, multiple exam rooms and a lab were added.

Learn more

UrgenCare of LaGrange

UrgenCare Clinic in LaGrange, Georgia is a 2,000 sq. ft. build-out of an empty retail space. A ribbon slab had been poured which was infilled after plumbing and electrical utilities were installed. The new UrgenCare Clinic office has a nurses station, lab, administration offices, eight treatment rooms and an X-ray suite.

UrgenCare Clinic in LaGrange, Georgia is a 2,000 sq. ft. build-out of an empty retail space. A ribbon slab had been poured which was infilled after plumbing and electrical utilities were installed. The new UrgenCare Clinic office has a nurses station, lab, administration offices, eight treatment rooms and an X-ray suite.

Learn more

Hughston Clinic Billing Department

Principle was hired as a design-build partner with 2WR Architects to renovate an existing structure located in the Main Street Village in Columbus, GA. The new office will house support operations for the Hughston Clinic. Principle President Leon Moody said “The Owner requested an accelerated schedule and with the help of a great team we were able to hit our goal.

Principle was hired as a design-build partner with 2WR Architects to renovate an existing structure located in the Main Street Village in Columbus, GA. The new office will house support operations for the Hughston Clinic. Principle President Leon Moody said “The Owner requested an accelerated schedule and with the help of a great team we were able to hit our goal.

Learn more

Valley Park Manor

Principle Construction was hired to renovate Valley Park Manor, a retirement center in Valley, AL. The renovation took four months to complete and included patient rooms, dining room, lobby and sitting areas, and a commercial kitchen. A laundry room and storage room were added at the end of the project.

Principle Construction was hired to renovate Valley Park Manor, a retirement center in Valley, AL. The renovation took four months to complete and included patient rooms, dining room, lobby and sitting areas, and a commercial kitchen.  A laundry room and storage room were added at the end of the project.

Learn more

LaGrange Police Department Additions & Renovations

The City of LaGrange hired Principle and Smith Design Group for this detailed project. Phase one of this project added an evidence room, offices, uniform storage, locker room, weight room, and evidence vehicle storage underneath the existing LPD parking garage.

The City of LaGrange hired Principle and Smith Design Group for this detailed project. Phase one of this project added an evidence room, offices, uniform storage, locker room, weight room, and evidence vehicle storage underneath the existing LPD parking garage. Phase one exterior improvements included a new facade around the structure, new lighting, and landscaping. Phase two consisted of a new parking lot, additional exterior enhancements, and renovations to the existing two story LPD Building. Phase three is currently underway and consists of renovations to the third floor where the detectives’ offices, interrogation rooms, meeting rooms and various offices are located.

Learn more

Chambers County 911 Command Center

The Chambers County 911 Command Center features state-of-the-art technology housed in a large concrete bunker with bullet proof doors and walls. It has three levels of redundancy to prevent any loss of power. All local EMS personnel are able to communicate with one another via this facility during a storm or emergency.

The Chambers County 911 Command Center features state-of-the-art technology housed in a large concrete bunker with bullet proof doors and walls. It has three levels of redundancy to prevent any loss of power. All local EMS personnel are able to communicate with one another via this facility during a storm or emergency.

Learn more

Harris County Fire Station

The Northwest Harris County Volunteer Fire Department hired Principle to conduct planning, preconstruction, design and construction of this 7,000 SF rural fire station. Principle worked with the owner to achieve their budget. Construction was completed in three months. The facility includes two bays, a kitchen and living quarters.

The Northwest Harris County Volunteer Fire Department hired Principle to conduct planning, preconstruction, design and construction of this 7,000 SF rural fire station. Principle worked with the owner to achieve their budget. Construction was completed in three months. The facility includes two bays, a kitchen and living quarters.

Learn more

City of LaGrange Fire Station #5

Fire Station #5 is the newest station in LaGrange, Georgia and is a Command Post to be used for Emergencies and Natural Disasters. It is centrally located in the City and is directly across the street from WellStar West Georgia Health Center. The 7,800 SF facility has five bedrooms, six bathrooms, command offices, gym, and a state-of-the-art communication system.

Fire Station #5 is the newest station in LaGrange, Georgia and is a Command Post to be used for Emergencies and Natural Disasters. It is centrally located in the City and is directly across the street from WellStar West Georgia Health Center. The 7,800 SF facility has five bedrooms, six bathrooms, command offices, gym, and a state-of-the-art communication system. The exterior is accented by the 32 foot tall tower with white cast stone and a two-story glass façade. The original pole was saved from Station One when it was demolished and installed in Fire Station #5 thus adding a meaningful piece of history to the new station.

Learn more

Meriwether County Fire Stations

Principle Construction was hired as Construction Manager to design and construct fire stations in Woodbury, Durand, Odessadale, Lone Oak, The Cove, and Luthersville. Meriwether County created a new Fire Tax District to provide funds for their new fire station program.

Principle Construction was hired as Construction Manager to design and construct fire stations in Woodbury, Durand, Odessadale, Lone Oak, The Cove, and Luthersville. Meriwether County created a new Fire Tax District to provide funds for their new fire station program.

Learn more

Town of Pine Mountain Public Works Facility

The Town of Pine Mountain hired Principle to build a new Public Works Facility. Principle ordered and erected a Pre-Engineered Metal Building and built out offices, restrooms, interior storage and storage for mowers and tractors under a large overhang outside the building.

The Town of Pine Mountain hired Principle to build a new Public Works Facility. Principle ordered and erected a Pre-Engineered Metal Building and built out offices, restrooms, interior storage and storage for mowers and tractors under a large overhang outside the building.

Learn more

Fort Benning Officers Club Renovations

This project involved renovating the historic Officers Club at Ft. Benning. Interior renovations included upfit in the lobby, restrooms, and a large ballroom.

This project involved renovating the historic Officers Club at Ft. Benning. Interior renovations included upfit in the lobby, restrooms, and a large ballroom.

Learn more

Hillside Montessori School

Principle was hired as Construction Manager for this new 16,000 SF private school. Services included planning, value engineering, cost estimating, scoping and bidding to local subcontractors, managing all construction activities, and owner move-in. 

Learn more

Fokker Services

For Fokker Services, a Dutch aerospace company refurbishing aircraft components, we completed extensive upgrades at their LaGrange, GA, facility. The work included a new solar farm, 10,000 square feet of warehouse space, a new test cell, and renovations to 20,000 square feet of office space. This project enhanced capacity and modernized the site with minimal disruption, all while the client remained in operation.

Learn more

YOGAO

The YOGAO project in LaGrange, GA, features 50,000 square feet of warehouse space with integrated office and restroom areas. Designed as a speculative facility, it provides adaptable space for future manufacturing or distribution operations.

Learn more

Remington Warehouse & Office Space

The Remington facility in LaGrange, GA, features 280,000 square feet of manufacturing and warehouse space and 20,000 square feet of offices. Completed for long-term durability and efficiency, the project supports the client’s growing industrial presence in the region.

Learn more

Ridley Lake

Ridley Lake Park is a 44-acre development for the City of LaGrange that will bring new recreational space to the community. The site will feature walking trails, open areas, and a playground overlooking the lake. Our team is currently managing construction, coordinating design details, and preparing the grounds for public use.

Learn more

Fort Benning Officers Club Renovations

This project involved renovating the historic Officers Club at Ft. Benning. Interior renovations included upfit in the lobby, restrooms, and a large ballroom.

Learn more

Town of Pine Mountain Public Works Facility

The Town of Pine Mountain hired Principle to build a new Public Works Facility. Principle ordered and erected a Pre-Engineered Metal Building and built out offices, restrooms, interior storage and storage for mowers and tractors under a large overhang outside the building.

Learn more

Meriwether County Fire Stations

Principle Construction was hired as Construction Manager to design and construct fire stations in Woodbury, Durand, Odessadale, Lone Oak, The Cove, and Luthersville. Meriwether County created a new Fire Tax District to provide funds for their new fire station program.

Learn more

City of LaGrange Fire Station #5

Fire Station #5 is the newest station in LaGrange, Georgia and is a Command Post to be used for Emergencies and Natural Disasters. It is centrally located in the City and is directly across the street from WellStar West Georgia Health Center. The 7,800 SF facility has five bedrooms, six bathrooms, command offices, gym, and a state-of-the-art communication system.

Learn more

Harris County Fire Station

The Northwest Harris County Volunteer Fire Department hired Principle to conduct planning, preconstruction, design and construction of this 7,000 SF rural fire station. Principle worked with the owner to achieve their budget. Construction was completed in three months. The facility includes two bays, a kitchen and living quarters.

Learn more

Chambers County 911 Command Center

The Chambers County 911 Command Center features state-of-the-art technology housed in a large concrete bunker with bullet proof doors and walls. It has three levels of redundancy to prevent any loss of power. All local EMS personnel are able to communicate with one another via this facility during a storm or emergency.

Learn more

LaGrange Police Department Additions & Renovations

The City of LaGrange hired Principle and Smith Design Group for this detailed project. Phase one of this project added an evidence room, offices, uniform storage, locker room, weight room, and evidence vehicle storage underneath the existing LPD parking garage.

Learn more

Valley Park Manor

Principle Construction was hired to renovate Valley Park Manor, a retirement center in Valley, AL. The renovation took four months to complete and included patient rooms, dining room, lobby and sitting areas, and a commercial kitchen. A laundry room and storage room were added at the end of the project.

Learn more

Hughston Clinic Billing Department

Principle was hired as a design-build partner with 2WR Architects to renovate an existing structure located in the Main Street Village in Columbus, GA. The new office will house support operations for the Hughston Clinic. Principle President Leon Moody said “The Owner requested an accelerated schedule and with the help of a great team we were able to hit our goal.

Learn more

UrgenCare of LaGrange

UrgenCare Clinic in LaGrange, Georgia is a 2,000 sq. ft. build-out of an empty retail space. A ribbon slab had been poured which was infilled after plumbing and electrical utilities were installed. The new UrgenCare Clinic office has a nurses station, lab, administration offices, eight treatment rooms and an X-ray suite.

Learn more

Medical Park Foundation Building 700

Principle renovated Building 700 in the Medical Park adjacent to WellStar Medical Center in LaGrange, Georgia to accommodate two new doctors. Renovations were made to the upper floor and lower floor of the building. Two new lobbies, three doctors offices, multiple exam rooms and a lab were added.

Learn more

Medical Park Foundation Building 100

Principle renovated Building 100 in the Medical Park adjacent to WellStar Medical Center in LaGrange, Georgia to accommodate two new doctors. Complete renovations were made to the upper floor and lower floor of the building. Two new lobbies, three doctors offices, multiple exam rooms and a lab were added.

Learn more

Mercer Medical Clinic

This 5,200 SF primary care facility located in Hamilton, Georgia is a collaboration between Mercer University and Harris County government. Southern A&E was the architect. The project consisted of renovations of an existing library updated to a state-of-the-area facility including 8 exam rooms, X-ray imaging room, consultation rooms, patient waiting rooms, Doctors offices, and receptionist desk.

Learn more

Interface Kyle 3 Plant

This project involved adding 17′ to the roof to allow for taller equipment to fit. Principle worked with Interface Engineering to determine the footing design and column spacing for the new structural columns. The project was completed within the short schedule to allow for the equipment to be installed.

Learn more

Ray C. Anderson Plant Break Room

Principle was hired by Interface Flooring to build an interior break room and outside gathering and eating pavilion and seating spaces. The interior break room included refrigerators, microwaves, vending machines, seating areas, and lobby renovations.

Learn more

Nesper International Plant Expansion

Principle Construction was hired to add 11,000 sq. ft. of manufacturing space at Nesper International. The project has no interior columns and a clear span of 75 feet. Three cranes are hung and supported by the roof. The concrete slab is topped with a Sikka product to add an orange peel 10,000 lbs/sf protective coating.

Learn more

Kimberly Clark Additions & Renovations

Principle was hired for multiple additions and renovations at the LaGrange Plant. The first project involved building a 30′ x 600′ wall to separate a warehouse into two areas. One area was conditioned to create a production area. Two mobile office units were added with sidewalks for covid testing on the front of the plant.

Learn more

Callaway Blue Spring Water Expansion

New Construction and Renovations are complete for the 65,000 SF and 8,000 SF Office Space. The warehouse consisted of a PEMB with foundation walls comprising a new truck court and trucker’s lounge. The new PEMB is free-span with no interior colum lines, has a standing seam roof and liner panels that extend from floor to ceiling. Fire Wall Assemblies were included to separate process areas and office from the new warehouse. This facility also features the latest / greatest dock equipment safety features available and automated ventilation systems.

Learn more

Historic Sweet Auburn Avenue Retail Renovation

This project was a Historic Renovation of a building that was originally built in 1920 on the acclaimed Sweet Auburn Avenue in Atlanta. Principle gutted the building and a new stainless steel storefront was added. Floors have been stripped to expose the terrazzo tile floors. The use of the building is retail on the first floor and residential on the second floor. Tenants include the Atlanta Breakfast Club and Sweet Auburn Community Museum.

Learn more

Historic Davis Building Renovation

This historic building was constructed in 1875 on the square in downtown LaGrange, Georgia. It is the oldest remaining building on the square. In 1898 a room was added to the front and a Mesker Brothers decorative metal storefront was added to the building which is still in tact today and gives the building its ornate look.

Learn more

Granger Park Renovation

The $1.6 million Granger Park Playground project consists of complete renovations to an existing 1.5-acre playground in LaGrange, Georgia. This SPLOST funded project features new playground equipment and furnishings, 36 ft. pavilion with picnic tables, oval tricycle path, entrance trellis, unique boardwalk structure, new parking lot with handicap access, new landscaping with added flowers and trees, and a walking trail with direct connection to the thread.

Learn more

Camp Viola Event Hall

Principle was hired to help plan, design and build the new event hall at Camp Viola. The existing dining hall had become structurally unsound so it was demolished while designs for a new event hall were planned. The new facility includes a multi-purpose large room that can be used for dining during camp, weddings and events, a commercial kitchen, restrooms, bathrooms, three bedrooms and a large porch on two sides. A new basketball court and landscaping were added.

Learn more

Recycling & Distribution Center

The project consisted of a two story office building providing offices, meeting spaces, educational areas and a roof-top garden. The rear of the facility is where the recyclables are received, sorted and staged in a 45,000 SF warehouse. The warehouse includes equipment pits, bunker walls, loading docks, and automated overhead doors.

Learn more

The Estate at Elegant Occasions Event Center

Principle was hired to build out The Estate at Elegant Occasions Event Center in Hogansville, Georgia. The project consisted of a new groom’s suite, office areas and additional storage for event tables and accessories. In the main event center room ornamental metal was added to the ceiling, new doors and fixtures including two chandeliers, windows, and new painting and staining were completed. The 3,700 SF Event Center can host events accommodating up to 120 people.

Learn more

LaGrange Memorial Library

The Troup County Library Board of Trustees hired Principle to renovate the 12,000 square feet existing facility and add an additional 7,000 square feet. The renovations include meeting rooms, children’s areas, reading nooks, outdoor play area, and offices. The project was completed in February 2023.

Learn more

OUR SERVICES

End-to-End Expertise,
Every Step of the Way

Project Planning

Planning sets the tone for the whole job. We ensure that budgets and timelines are realistic from the outset.

learn more

Preconstruction

We study drawings, budgets, and schedules early to promote precise planning and prevent problems in the field. The preconstruction phase enables owners to make informed decisions before work commences.

learn more

Construction

This is where the preconstruction plan turns into a building. We stay involved every day to see our plans through to timely completion.

learn more

OUR TESTIMONIALS

Hear It from Our Partners

Bill Bulloch

Assistant City Manager, City of Lagrange

In this testimonial, Bill Bulloch, Assistant City Manager for the City of LaGrange, shares how working with Principle Construction has strengthened local projects and partnerships. Over the past five years, we’ve collaborated on improvements throughout LaGrange, including Granger Park, Ridley Lake Park, and several downtown streetscapes. 

When issues arise, our leadership is on-site to address them directly. Bill points to that involvement—and our team’s local roots—as the difference-maker. We live here, work here, and care about how each project affects our community. That shared investment keeps the work personal and the results lasting. 

Bill also recalls a project where proactive communication prevented costly rework. Catching a potential design issue early saved time, resources, and frustration. That attention to detail reflects how we approach every job: clear communication, early coordination, and accountability from planning through completion. 

We’re proud to continue serving LaGrange with projects that build both spaces and trust.

Kim Myers

Board Member, LaGrange Memorial Library

Kim Myers, a board member for the LaGrange Memorial Library and co-chair for the new childcare center at LaGrange First United Methodist Church, shares how our work helped bring new life to a community landmark. 

Hear as Kim describes how trust shaped the process from start to finish. Our team’s communication, dependability, and commitment to staying on time and on budget made a lasting impression. Seeing the library recognized in Architectural Magazine affirmed what she and others already knew: the space stands as a reflection of teamwork, shared vision, and care for the people who use it every day. 

The renovation of the LaGrange Memorial Library presented an opportunity to reimagine a public space that serves people of all ages. The building had once felt closed off and dim, but through close collaboration with the library board and local partners, we opened the space, introduced more light, and created a warm, welcoming environment that reflects the heart of the community.

Jeff Matthews

Vice President of Operations, Fokker Services Group

At Fokker Services Group in LaGrange, Georgia, partnerships matter as much as performance. Vice President of Operations Jeff Matthews shares his experience working with our team and how that relationship has grown through trust and collaboration. 

Jeff emphasizes the importance of having a contractor who shows up, follows through, and remains involved long after the project is completed. He values how our team remains accessible, dependable, and committed to the same high standards from start to finish. 

For us, service doesn’t end when the job is finished. It begins with open communication and continues through every stage of a project. When questions arise or a site requires further review, we respond. That approach has shaped a partnership built on consistency, respect, and shared goals. 

We take pride in relationships like this one. Fokker’s trust reflects what we strive for in every job: accountability, quality, and a partnership that lasts beyond the final walkthrough.

our values

01

We Place the Customer Experience at the Top in Importance

02

We are Committed to Our People

03

We Operate Our Business Ethically

04

We Strive Continually to Improve

05

We Give Back to Our Community

ABOUT US

Built with Integrity.
Led by Principle.

At Principle Construction, we’re a full-service construction partner built across commercial, industrial, healthcare, education, and civic markets. Here, every project starts with meticulous planning and is followed by consistent oversight, ensuring our clients know what to expect and can move forward with confidence.

Who we are on site reflects who we are as a construction management company. Rooted in commitment and craftsmanship, our core values are evident in how we plan, communicate, and carry responsibility for our work. Clients don’t get polished promises; they get a team that stays present, addresses issues directly, and sees things through to completion.

We take pride in investing in our people as individuals, fostering a culture where growth, respect, and accountability guide our approach. The result is a team that shows up ready to do things right for our clients, our communities, and one another.

Our Leadership

Leon Moody

President & CEO

Jay Johnson

Vice President & Senior Project Manager

Paul Posey

Senior Vice President, General Manager

Brent Conrad

Director of Preconstruction

Jeff Lewis

Senior Project Manager

Joseph Alise

Project Manager

Ashley Smith

Project Coordinator

Maggie Gaddy

Assistant Project Coordinator

Mandi McEwen

Estimator

Renee Ker-Fox

Office Manager

Let’s Build
Something That
Lasts.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.