Portfolio
Showcasing our work in commercial, industrial, healthcare, and municipal spaces.
WHAT WE DO
Purpose-Driven Projects.
Principle-Led Results.
From private builds to public spaces, our construction projects show the range of environments we help bring to life. Explore the categories to see how different goals and needs shape the work we deliver.

Hillside Montessori School
Principle was hired as Construction Manager for this new 16,000 SF private school. Services included planning, value engineering, cost estimating, scoping and bidding to local subcontractors, managing all construction activities, and owner move-in.
Principle was hired as Construction Manager for this new 16,000 SF private school. Services included planning, value engineering, cost estimating, scoping and bidding to local subcontractors, managing all construction activities, and owner move-in.

Granger Park Renovation
The $1.6 million Granger Park Playground project consists of complete renovations to an existing 1.5-acre playground in LaGrange, Georgia. This SPLOST funded project features new playground equipment and furnishings, 36 ft. pavilion with picnic tables, oval tricycle path, entrance trellis, unique boardwalk structure, new parking lot with handicap access, new landscaping with added flowers and trees, and a walking trail with direct connection to the thread.
The $1.6 million Granger Park Playground project consists of complete renovations to an existing 1.5-acre playground in LaGrange, Georgia. This SPLOST funded project features new playground equipment and furnishings, 36 ft. pavilion with picnic tables, oval tricycle path, entrance trellis, unique boardwalk structure, new parking lot with handicap access, new landscaping with added flowers and trees, and a walking trail with direct connection to the thread.
.jpg)
LaGrange Memorial Library
The Troup County Library Board of Trustees hired Principle to renovate the 12,000 square feet existing facility and add an additional 7,000 square feet. The renovations include meeting rooms, children’s areas, reading nooks, outdoor play area, and offices. The project was completed in February 2023.
The Troup County Library Board of Trustees hired Principle to renovate the 12,000 square feet existing facility and add an additional 7,000 square feet. The renovations include meeting rooms, children’s areas, reading nooks, outdoor play area, and offices. The project was completed in February 2023.

The Estate at Elegant Occasions Event Center
Principle was hired to build out The Estate at Elegant Occasions Event Center in Hogansville, Georgia. The project consisted of a new groom’s suite, office areas and additional storage for event tables and accessories. In the main event center room ornamental metal was added to the ceiling, new doors and fixtures including two chandeliers, windows, and new painting and staining were completed. The 3,700 SF Event Center can host events accommodating up to 120 people.
Principle was hired to build out The Estate at Elegant Occasions Event Center in Hogansville, Georgia. The project consisted of a new groom’s suite, office areas and additional storage for event tables and accessories. In the main event center room ornamental metal was added to the ceiling, new doors and fixtures including two chandeliers, windows, and new painting and staining were completed. The 3,700 SF Event Center can host events accommodating up to 120 people.

Recycling & Distribution Center
The project consisted of a two story office building providing offices, meeting spaces, educational areas and a roof-top garden. The rear of the facility is where the recyclables are received, sorted and staged in a 45,000 SF warehouse. The warehouse includes equipment pits, bunker walls, loading docks, and automated overhead doors.
The project consisted of a two story office building providing offices, meeting spaces, educational areas and a roof-top garden. The rear of the facility is where the recyclables are received, sorted and staged in a 45,000 SF warehouse. The warehouse includes equipment pits, bunker walls, loading docks, and automated overhead doors. Jay Johnson served as Sr. Project Manager, and the project obtained LEED Certification, the first of any significant capital improvement projects for the Consolidated Government of Columbus and Muscogee County. The Columbus Recycling and Sustainability Center processes all recyclables for Muscogee County and the surrounding areas daily.

Camp Viola Event Hall
Principle was hired to help plan, design and build the new event hall at Camp Viola. The existing dining hall had become structurally unsound so it was demolished while designs for a new event hall were planned. The new facility includes a multi-purpose large room that can be used for dining during camp, weddings and events, a commercial kitchen, restrooms, bathrooms, three bedrooms and a large porch on two sides. A new basketball court and landscaping were added.
Principle was hired to help plan, design and build the new event hall at Camp Viola. The existing dining hall had become structurally unsound so it was demolished while designs for a new event hall were planned. The new facility includes a multi-purpose large room that can be used for dining during camp, weddings and events, a commercial kitchen, restrooms, bathrooms, three bedrooms and a large porch on two sides. A new basketball court and landscaping were added.

Historic Davis Building Renovation
This historic building was constructed in 1875 on the square in downtown LaGrange, Georgia. It is the oldest remaining building on the square. In 1898 a room was added to the front and a Mesker Brothers decorative metal storefront was added to the building which is still in tact today and gives the building its ornate look.
This historic building was constructed in 1875 on the square in downtown LaGrange, Georgia. It is the oldest remaining building on the square. In 1898 a room was added to the front and a Mesker Brothers decorative metal storefront was added to the building which is still in tact today and gives the building its ornate look. Principle Construction restored and renovated the building in an effort to prevent demolition and preserve the historic character of downtown LaGrange. The Davis building features a basement and two floors above ground. A steel frame was added inside the load bearing walls. An EIFS system was applied to the exterior. The project owner is United Investors, project architect was Smith Design Group, and the project engineer was Stothard Engineering.
The first floor now houses a boutique and the second floor houses Lafayette Loft.

Historic Sweet Auburn Avenue Retail Renovation
This project was a Historic Renovation of a building that was originally built in 1920 on the acclaimed Sweet Auburn Avenue in Atlanta. Principle gutted the building and a new stainless steel storefront was added. Floors have been stripped to expose the terrazzo tile floors. The use of the building is retail on the first floor and residential on the second floor. Tenants include the Atlanta Breakfast Club and Sweet Auburn Community Museum.
This project was a Historic Renovation of a building that was originally built in 1920 on the acclaimed Sweet Auburn Avenue in Atlanta. Principle gutted the building and a new stainless steel storefront was added. Floors have been stripped to expose the terrazzo tile floors. The use of the building is retail on the first floor and residential on the second floor. Tenants include the Atlanta Breakfast Club and Sweet Auburn Community Museum.

Ridley Lake
Ridley Lake Park is a 44-acre development for the City of LaGrange that will bring new recreational space to the community. The site will feature walking trails, open areas, and a playground overlooking the lake. Our team is currently managing construction, coordinating design details, and preparing the grounds for public use.
Ridley Lake Park is a 44-acre development for the City of LaGrange that will bring new recreational space to the community. The site will feature walking trails, open areas, and a playground overlooking the lake. Our team is currently managing construction, coordinating design details, and preparing the grounds for public use.

Remington Warehouse & Office Space
The Remington facility in LaGrange, GA, features 280,000 square feet of manufacturing and warehouse space and 20,000 square feet of offices. Completed for long-term durability and efficiency, the project supports the client’s growing industrial presence in the region.
The Remington facility in LaGrange, GA, features 280,000 square feet of manufacturing and warehouse space and 20,000 square feet of offices. Completed for long-term durability and efficiency, the project supports the client’s growing industrial presence in the region.

YOGAO
The YOGAO project in LaGrange, GA, features 50,000 square feet of warehouse space with integrated office and restroom areas. Designed as a speculative facility, it provides adaptable space for future manufacturing or distribution operations.
The YOGAO project in LaGrange, GA, features 50,000 square feet of warehouse space with integrated office and restroom areas. Designed as a speculative facility, it provides adaptable space for future manufacturing or distribution operations.

Callaway Blue Spring Water Expansion
New Construction and Renovations are complete for the 65,000 SF and 8,000 SF Office Space. The warehouse consisted of a PEMB with foundation walls comprising a new truck court and trucker’s lounge. The new PEMB is free-span with no interior colum lines, has a standing seam roof and liner panels that extend from floor to ceiling. Fire Wall Assemblies were included to separate process areas and office from the new warehouse. This facility also features the latest / greatest dock equipment safety features available and automated ventilation systems.
New Construction and Renovations are complete for the 65,000 SF and 8,000 SF Office Space. The warehouse consisted of a PEMB with foundation walls comprising a new truck court and trucker’s lounge. The new PEMB is free-span with no interior colum lines, has a standing seam roof and liner panels that extend from floor to ceiling. Fire Wall Assemblies were included to separate process areas and office from the new warehouse. This facility also features the latest / greatest dock equipment safety features available and automated ventilation systems.

Kimberly Clark Additions & Renovations
Principle was hired for multiple additions and renovations at the LaGrange Plant. The first project involved building a 30′ x 600′ wall to separate a warehouse into two areas. One area was conditioned to create a production area. Two mobile office units were added with sidewalks for covid testing on the front of the plant.
Principle was hired for multiple additions and renovations at the LaGrange Plant. The first project involved building a 30′ x 600′ wall to separate a warehouse into two areas. One area was conditioned to create a production area. Two mobile office units were added with sidewalks for covid testing on the front of the plant. A three story addition was then added on the back of the plant. It houses blowers and bailers for production equipment along with advanced sensitive control equipment and a highly regulated heating and air conditioned space. Principle replaced two 30 ton split units in the existing plant as well as reroofing one of the buildings.

Nesper International Plant Expansion
Principle Construction was hired to add 11,000 sq. ft. of manufacturing space at Nesper International. The project has no interior columns and a clear span of 75 feet. Three cranes are hung and supported by the roof. The concrete slab is topped with a Sikka product to add an orange peel 10,000 lbs/sf protective coating.
Principle Construction was hired to add 11,000 sq. ft. of manufacturing space at Nesper International. The project has no interior columns and a clear span of 75 feet. Three cranes are hung and supported by the roof. The concrete slab is topped with a Sikka product to add an orange peel 10,000 lbs/sf protective coating. The addition is located on the back of the existing plant. The Design-Build team consisted of Smith Design Group for architectural design, and Starzer Brady Fagan for structural design. Nesper is a German based firm and this is their only U.S. operation. They manufacture contact rivets, stamped parts and plastic assemblies for the electrical and electronic industries.

Fokker Services
For Fokker Services, a Dutch aerospace company refurbishing aircraft components, we completed extensive upgrades at their LaGrange, GA, facility. The work included a new solar farm, 10,000 square feet of warehouse space, a new test cell, and renovations to 20,000 square feet of office space. This project enhanced capacity and modernized the site with minimal disruption, all while the client remained in operation.
For Fokker Services, a Dutch aerospace company refurbishing aircraft components, we completed extensive upgrades at their LaGrange, GA, facility. The work included a new solar farm, 10,000 square feet of warehouse space, a new test cell, and renovations to 20,000 square feet of office space. This project enhanced capacity and modernized the site with minimal disruption, all while the client remained in operation.

Ray C. Anderson Plant Break Room
Principle was hired by Interface Flooring to build an interior break room and outside gathering and eating pavilion and seating spaces. The interior break room included refrigerators, microwaves, vending machines, seating areas, and lobby renovations.
Principle was hired by Interface Flooring to build an interior break room and outside gathering and eating pavilion and seating spaces. The interior break room included refrigerators, microwaves, vending machines, seating areas, and lobby renovations.

Interface Kyle 3 Plant
This project involved adding 17′ to the roof to allow for taller equipment to fit. Principle worked with Interface Engineering to determine the footing design and column spacing for the new structural columns. The project was completed within the short schedule to allow for the equipment to be installed.
This project involved adding 17′ to the roof to allow for taller equipment to fit. Principle worked with Interface Engineering to determine the footing design and column spacing for the new structural columns. The project was completed within the short schedule to allow for the equipment to be installed.
In phase 2 of the Interface Kyle 3 project, Principle Construction installed the civil infrastructure to support the equipment modification completed earlier in phase 1. The project included the addition of 460 ft. of access drive with DOT guardrails, 5 ft. depth Silo base pad with auger-cast pile foundation, 18 ft. x 56 ft. pre-engineered metal building, new fencing and landscaping.

Mercer Medical Clinic
This 5,200 SF primary care facility located in Hamilton, Georgia is a collaboration between Mercer University and Harris County government. Southern A&E was the architect. The project consisted of renovations of an existing library updated to a state-of-the-area facility including 8 exam rooms, X-ray imaging room, consultation rooms, patient waiting rooms, Doctors offices, and receptionist desk.
This 5,200 SF primary care facility located in Hamilton, Georgia is a collaboration between Mercer University and Harris County government. Southern A&E was the architect. The project consisted of renovations of an existing library updated to a state-of-the-area facility including 8 exam rooms, X-ray imaging room, consultation rooms, patient waiting rooms, Doctors offices, and receptionist desk.

Medical Park Foundation Building 100
Principle renovated Building 100 in the Medical Park adjacent to WellStar Medical Center in LaGrange, Georgia to accommodate two new doctors. Complete renovations were made to the upper floor and lower floor of the building. Two new lobbies, three doctors offices, multiple exam rooms and a lab were added.
Principle renovated Building 100 in the Medical Park adjacent to WellStar Medical Center in LaGrange, Georgia to accommodate two new doctors. Complete renovations were made to the upper floor and lower floor of the building. Two new lobbies, three doctors offices, multiple exam rooms and a lab were added.

Medical Park Foundation Building 700
Principle renovated Building 700 in the Medical Park adjacent to WellStar Medical Center in LaGrange, Georgia to accommodate two new doctors. Renovations were made to the upper floor and lower floor of the building. Two new lobbies, three doctors offices, multiple exam rooms and a lab were added.
Principle renovated Building 700 in the Medical Park adjacent to WellStar Medical Center in LaGrange, Georgia to accommodate two new doctors. Renovations were made to the upper floor and lower floor of the building. Two new lobbies, three doctors offices, multiple exam rooms and a lab were added.

UrgenCare of LaGrange
UrgenCare Clinic in LaGrange, Georgia is a 2,000 sq. ft. build-out of an empty retail space. A ribbon slab had been poured which was infilled after plumbing and electrical utilities were installed. The new UrgenCare Clinic office has a nurses station, lab, administration offices, eight treatment rooms and an X-ray suite.
UrgenCare Clinic in LaGrange, Georgia is a 2,000 sq. ft. build-out of an empty retail space. A ribbon slab had been poured which was infilled after plumbing and electrical utilities were installed. The new UrgenCare Clinic office has a nurses station, lab, administration offices, eight treatment rooms and an X-ray suite.

Hughston Clinic Billing Department
Principle was hired as a design-build partner with 2WR Architects to renovate an existing structure located in the Main Street Village in Columbus, GA. The new office will house support operations for the Hughston Clinic. Principle President Leon Moody said “The Owner requested an accelerated schedule and with the help of a great team we were able to hit our goal.
Principle was hired as a design-build partner with 2WR Architects to renovate an existing structure located in the Main Street Village in Columbus, GA. The new office will house support operations for the Hughston Clinic. Principle President Leon Moody said “The Owner requested an accelerated schedule and with the help of a great team we were able to hit our goal.

Valley Park Manor
Principle Construction was hired to renovate Valley Park Manor, a retirement center in Valley, AL. The renovation took four months to complete and included patient rooms, dining room, lobby and sitting areas, and a commercial kitchen. A laundry room and storage room were added at the end of the project.
Principle Construction was hired to renovate Valley Park Manor, a retirement center in Valley, AL. The renovation took four months to complete and included patient rooms, dining room, lobby and sitting areas, and a commercial kitchen. A laundry room and storage room were added at the end of the project.

LaGrange Police Department Additions & Renovations
The City of LaGrange hired Principle and Smith Design Group for this detailed project. Phase one of this project added an evidence room, offices, uniform storage, locker room, weight room, and evidence vehicle storage underneath the existing LPD parking garage.
The City of LaGrange hired Principle and Smith Design Group for this detailed project. Phase one of this project added an evidence room, offices, uniform storage, locker room, weight room, and evidence vehicle storage underneath the existing LPD parking garage. Phase one exterior improvements included a new facade around the structure, new lighting, and landscaping. Phase two consisted of a new parking lot, additional exterior enhancements, and renovations to the existing two story LPD Building. Phase three is currently underway and consists of renovations to the third floor where the detectives’ offices, interrogation rooms, meeting rooms and various offices are located.

Chambers County 911 Command Center
The Chambers County 911 Command Center features state-of-the-art technology housed in a large concrete bunker with bullet proof doors and walls. It has three levels of redundancy to prevent any loss of power. All local EMS personnel are able to communicate with one another via this facility during a storm or emergency.
The Chambers County 911 Command Center features state-of-the-art technology housed in a large concrete bunker with bullet proof doors and walls. It has three levels of redundancy to prevent any loss of power. All local EMS personnel are able to communicate with one another via this facility during a storm or emergency.

Harris County Fire Station
The Northwest Harris County Volunteer Fire Department hired Principle to conduct planning, preconstruction, design and construction of this 7,000 SF rural fire station. Principle worked with the owner to achieve their budget. Construction was completed in three months. The facility includes two bays, a kitchen and living quarters.
The Northwest Harris County Volunteer Fire Department hired Principle to conduct planning, preconstruction, design and construction of this 7,000 SF rural fire station. Principle worked with the owner to achieve their budget. Construction was completed in three months. The facility includes two bays, a kitchen and living quarters.

City of LaGrange Fire Station #5
Fire Station #5 is the newest station in LaGrange, Georgia and is a Command Post to be used for Emergencies and Natural Disasters. It is centrally located in the City and is directly across the street from WellStar West Georgia Health Center. The 7,800 SF facility has five bedrooms, six bathrooms, command offices, gym, and a state-of-the-art communication system.
Fire Station #5 is the newest station in LaGrange, Georgia and is a Command Post to be used for Emergencies and Natural Disasters. It is centrally located in the City and is directly across the street from WellStar West Georgia Health Center. The 7,800 SF facility has five bedrooms, six bathrooms, command offices, gym, and a state-of-the-art communication system. The exterior is accented by the 32 foot tall tower with white cast stone and a two-story glass façade. The original pole was saved from Station One when it was demolished and installed in Fire Station #5 thus adding a meaningful piece of history to the new station.

Meriwether County Fire Stations
Principle Construction was hired as Construction Manager to design and construct fire stations in Woodbury, Durand, Odessadale, Lone Oak, The Cove, and Luthersville. Meriwether County created a new Fire Tax District to provide funds for their new fire station program.
Principle Construction was hired as Construction Manager to design and construct fire stations in Woodbury, Durand, Odessadale, Lone Oak, The Cove, and Luthersville. Meriwether County created a new Fire Tax District to provide funds for their new fire station program.

Town of Pine Mountain Public Works Facility
The Town of Pine Mountain hired Principle to build a new Public Works Facility. Principle ordered and erected a Pre-Engineered Metal Building and built out offices, restrooms, interior storage and storage for mowers and tractors under a large overhang outside the building.
The Town of Pine Mountain hired Principle to build a new Public Works Facility. Principle ordered and erected a Pre-Engineered Metal Building and built out offices, restrooms, interior storage and storage for mowers and tractors under a large overhang outside the building.

Fort Benning Officers Club Renovations
This project involved renovating the historic Officers Club at Ft. Benning. Interior renovations included upfit in the lobby, restrooms, and a large ballroom.
This project involved renovating the historic Officers Club at Ft. Benning. Interior renovations included upfit in the lobby, restrooms, and a large ballroom.
Heading 1
Heading 2
Heading 3
Heading 4
Heading 5
Heading 6
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.
Block quote
Ordered list
- Item 1
- Item 2
- Item 3
Unordered list
- Item A
- Item B
- Item C
Bold text
Emphasis
Superscript
Subscript

Hillside Montessori School
Principle was hired as Construction Manager for this new 16,000 SF private school. Services included planning, value engineering, cost estimating, scoping and bidding to local subcontractors, managing all construction activities, and owner move-in.

Fokker Services
For Fokker Services, a Dutch aerospace company refurbishing aircraft components, we completed extensive upgrades at their LaGrange, GA, facility. The work included a new solar farm, 10,000 square feet of warehouse space, a new test cell, and renovations to 20,000 square feet of office space. This project enhanced capacity and modernized the site with minimal disruption, all while the client remained in operation.

YOGAO
The YOGAO project in LaGrange, GA, features 50,000 square feet of warehouse space with integrated office and restroom areas. Designed as a speculative facility, it provides adaptable space for future manufacturing or distribution operations.

Remington Warehouse & Office Space
The Remington facility in LaGrange, GA, features 280,000 square feet of manufacturing and warehouse space and 20,000 square feet of offices. Completed for long-term durability and efficiency, the project supports the client’s growing industrial presence in the region.

Ridley Lake
Ridley Lake Park is a 44-acre development for the City of LaGrange that will bring new recreational space to the community. The site will feature walking trails, open areas, and a playground overlooking the lake. Our team is currently managing construction, coordinating design details, and preparing the grounds for public use.

Fort Benning Officers Club Renovations
This project involved renovating the historic Officers Club at Ft. Benning. Interior renovations included upfit in the lobby, restrooms, and a large ballroom.

Town of Pine Mountain Public Works Facility
The Town of Pine Mountain hired Principle to build a new Public Works Facility. Principle ordered and erected a Pre-Engineered Metal Building and built out offices, restrooms, interior storage and storage for mowers and tractors under a large overhang outside the building.

Meriwether County Fire Stations
Principle Construction was hired as Construction Manager to design and construct fire stations in Woodbury, Durand, Odessadale, Lone Oak, The Cove, and Luthersville. Meriwether County created a new Fire Tax District to provide funds for their new fire station program.

City of LaGrange Fire Station #5
Fire Station #5 is the newest station in LaGrange, Georgia and is a Command Post to be used for Emergencies and Natural Disasters. It is centrally located in the City and is directly across the street from WellStar West Georgia Health Center. The 7,800 SF facility has five bedrooms, six bathrooms, command offices, gym, and a state-of-the-art communication system.

Harris County Fire Station
The Northwest Harris County Volunteer Fire Department hired Principle to conduct planning, preconstruction, design and construction of this 7,000 SF rural fire station. Principle worked with the owner to achieve their budget. Construction was completed in three months. The facility includes two bays, a kitchen and living quarters.

Chambers County 911 Command Center
The Chambers County 911 Command Center features state-of-the-art technology housed in a large concrete bunker with bullet proof doors and walls. It has three levels of redundancy to prevent any loss of power. All local EMS personnel are able to communicate with one another via this facility during a storm or emergency.

LaGrange Police Department Additions & Renovations
The City of LaGrange hired Principle and Smith Design Group for this detailed project. Phase one of this project added an evidence room, offices, uniform storage, locker room, weight room, and evidence vehicle storage underneath the existing LPD parking garage.

Valley Park Manor
Principle Construction was hired to renovate Valley Park Manor, a retirement center in Valley, AL. The renovation took four months to complete and included patient rooms, dining room, lobby and sitting areas, and a commercial kitchen. A laundry room and storage room were added at the end of the project.

Hughston Clinic Billing Department
Principle was hired as a design-build partner with 2WR Architects to renovate an existing structure located in the Main Street Village in Columbus, GA. The new office will house support operations for the Hughston Clinic. Principle President Leon Moody said “The Owner requested an accelerated schedule and with the help of a great team we were able to hit our goal.

UrgenCare of LaGrange
UrgenCare Clinic in LaGrange, Georgia is a 2,000 sq. ft. build-out of an empty retail space. A ribbon slab had been poured which was infilled after plumbing and electrical utilities were installed. The new UrgenCare Clinic office has a nurses station, lab, administration offices, eight treatment rooms and an X-ray suite.

Medical Park Foundation Building 700
Principle renovated Building 700 in the Medical Park adjacent to WellStar Medical Center in LaGrange, Georgia to accommodate two new doctors. Renovations were made to the upper floor and lower floor of the building. Two new lobbies, three doctors offices, multiple exam rooms and a lab were added.

Medical Park Foundation Building 100
Principle renovated Building 100 in the Medical Park adjacent to WellStar Medical Center in LaGrange, Georgia to accommodate two new doctors. Complete renovations were made to the upper floor and lower floor of the building. Two new lobbies, three doctors offices, multiple exam rooms and a lab were added.

Mercer Medical Clinic
This 5,200 SF primary care facility located in Hamilton, Georgia is a collaboration between Mercer University and Harris County government. Southern A&E was the architect. The project consisted of renovations of an existing library updated to a state-of-the-area facility including 8 exam rooms, X-ray imaging room, consultation rooms, patient waiting rooms, Doctors offices, and receptionist desk.

Interface Kyle 3 Plant
This project involved adding 17′ to the roof to allow for taller equipment to fit. Principle worked with Interface Engineering to determine the footing design and column spacing for the new structural columns. The project was completed within the short schedule to allow for the equipment to be installed.

Ray C. Anderson Plant Break Room
Principle was hired by Interface Flooring to build an interior break room and outside gathering and eating pavilion and seating spaces. The interior break room included refrigerators, microwaves, vending machines, seating areas, and lobby renovations.

Nesper International Plant Expansion
Principle Construction was hired to add 11,000 sq. ft. of manufacturing space at Nesper International. The project has no interior columns and a clear span of 75 feet. Three cranes are hung and supported by the roof. The concrete slab is topped with a Sikka product to add an orange peel 10,000 lbs/sf protective coating.

Kimberly Clark Additions & Renovations
Principle was hired for multiple additions and renovations at the LaGrange Plant. The first project involved building a 30′ x 600′ wall to separate a warehouse into two areas. One area was conditioned to create a production area. Two mobile office units were added with sidewalks for covid testing on the front of the plant.

Callaway Blue Spring Water Expansion
New Construction and Renovations are complete for the 65,000 SF and 8,000 SF Office Space. The warehouse consisted of a PEMB with foundation walls comprising a new truck court and trucker’s lounge. The new PEMB is free-span with no interior colum lines, has a standing seam roof and liner panels that extend from floor to ceiling. Fire Wall Assemblies were included to separate process areas and office from the new warehouse. This facility also features the latest / greatest dock equipment safety features available and automated ventilation systems.

Historic Sweet Auburn Avenue Retail Renovation
This project was a Historic Renovation of a building that was originally built in 1920 on the acclaimed Sweet Auburn Avenue in Atlanta. Principle gutted the building and a new stainless steel storefront was added. Floors have been stripped to expose the terrazzo tile floors. The use of the building is retail on the first floor and residential on the second floor. Tenants include the Atlanta Breakfast Club and Sweet Auburn Community Museum.

Historic Davis Building Renovation
This historic building was constructed in 1875 on the square in downtown LaGrange, Georgia. It is the oldest remaining building on the square. In 1898 a room was added to the front and a Mesker Brothers decorative metal storefront was added to the building which is still in tact today and gives the building its ornate look.

Granger Park Renovation
The $1.6 million Granger Park Playground project consists of complete renovations to an existing 1.5-acre playground in LaGrange, Georgia. This SPLOST funded project features new playground equipment and furnishings, 36 ft. pavilion with picnic tables, oval tricycle path, entrance trellis, unique boardwalk structure, new parking lot with handicap access, new landscaping with added flowers and trees, and a walking trail with direct connection to the thread.

Camp Viola Event Hall
Principle was hired to help plan, design and build the new event hall at Camp Viola. The existing dining hall had become structurally unsound so it was demolished while designs for a new event hall were planned. The new facility includes a multi-purpose large room that can be used for dining during camp, weddings and events, a commercial kitchen, restrooms, bathrooms, three bedrooms and a large porch on two sides. A new basketball court and landscaping were added.

Recycling & Distribution Center
The project consisted of a two story office building providing offices, meeting spaces, educational areas and a roof-top garden. The rear of the facility is where the recyclables are received, sorted and staged in a 45,000 SF warehouse. The warehouse includes equipment pits, bunker walls, loading docks, and automated overhead doors.

The Estate at Elegant Occasions Event Center
Principle was hired to build out The Estate at Elegant Occasions Event Center in Hogansville, Georgia. The project consisted of a new groom’s suite, office areas and additional storage for event tables and accessories. In the main event center room ornamental metal was added to the ceiling, new doors and fixtures including two chandeliers, windows, and new painting and staining were completed. The 3,700 SF Event Center can host events accommodating up to 120 people.
.jpg)
LaGrange Memorial Library
The Troup County Library Board of Trustees hired Principle to renovate the 12,000 square feet existing facility and add an additional 7,000 square feet. The renovations include meeting rooms, children’s areas, reading nooks, outdoor play area, and offices. The project was completed in February 2023.
OUR SERVICES
End-to-End Expertise,
Every Step of the Way
Project Planning
Planning sets the tone for the whole job. We ensure that budgets and timelines are realistic from the outset.

Preconstruction
We study drawings, budgets, and schedules early to promote precise planning and prevent problems in the field. The preconstruction phase enables owners to make informed decisions before work commences.

Construction
This is where the preconstruction plan turns into a building. We stay involved every day to see our plans through to timely completion.

Let’s Build
Something That
Lasts.
